| CMP/221230/0010589 |
2022-12-30 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221230/0010585 |
2022-12-30 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221229/0010580 |
2022-12-29 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221229/0010579 |
2022-12-29 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221229/0010576 |
2022-12-29 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221229/0010575 |
2022-12-29 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010570 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010569 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010568 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010567 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010566 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010564 |
2022-12-28 |
Flats not handed over even after 8 months of committed date |
Disposed
|
| CMP/221228/0010563 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010562 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010561 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010560 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010559 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010558 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010557 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010556 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010555 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010554 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010553 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010552 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010551 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010550 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010549 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010548 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010547 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010546 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010545 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010544 |
2022-12-28 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221228/0010543 |
2022-12-28 |
Delay in Hand over (Occupancy) |
Disposed
|
| CMP/221226/0010525 |
2022-12-26 |
Compensation for delay on position |
Disposed
|
| CMP/221226/0010517 |
2022-12-26 |
Refund of entire amount with interest |
Disposed
|
| CMP/221222/0010512 |
2022-12-22 |
PROJECT PROGRESS IS NOT IN LINE TO MEET THE JAN2023 EXTENSION FROM RERA (PRM/KA/RERA/1251/310/PR/180222/002637) |
Disposed
|
| CMP/221220/0010487 |
2022-12-20 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221220/0010484 |
2022-12-20 |
Delay in handover of property and exceptional loss due to interest on loans taken |
Disposed
|
| CMP/221217/0010477 |
2022-12-17 |
Compensation for delay in handover and immediate possession of the property |
Disposed
|
| CMP/221217/0010476 |
2022-12-17 |
Delay of 3 years in possession. As of now more than 3 years delay in possession and demand for compensation |
Disposed
|
| CMP/221216/0010464 |
2022-12-16 |
REQUEEST FOR COMPENSATION |
Disposed
|
| CMP/221215/0010461 |
2022-12-15 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010460 |
2022-12-12 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010459 |
2022-12-12 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010458 |
2022-12-12 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010457 |
2022-12-12 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010456 |
2022-12-12 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010455 |
2022-12-12 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010454 |
2022-12-12 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010453 |
2022-12-12 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221212/0010452 |
2022-12-12 |
Delay in giving posession with false hopes |
Disposed
|
| CMP/221212/0010451 |
2022-12-12 |
Delay in giving posession |
Disposed
|
| CMP/221212/0010449 |
2022-12-12 |
Delay of Possession since promised date of December 2019 and Demand for Compensation |
Disposed
|
| CMP/221209/0010444 |
2022-12-09 |
Delay of Possession since December 2019 and Demand for Compensation |
Disposed
|
| CMP/221207/0010436 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
POSTED FOR ORDERS AUTHORITY FULLBENCH
|
| CMP/221207/0010434 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010433 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010432 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010431 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010430 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010429 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010428 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010427 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010426 |
2022-12-07 |
Flats not handed over even after 7 months of committed date |
Disposed
|
| CMP/221207/0010425 |
2022-12-07 |
Delay in Possession for more than 33 months |
Disposed
|
| CMP/221205/0010420 |
2022-12-05 |
Delay in handing over completed flat to me in Maple block |
Disposed
|
| CMP/221130/0010415 |
2022-11-30 |
Seeking Compensation for Inordinate Delays in Construction and Handover |
Disposed
|
| CMP/221125/0010403 |
2022-11-25 |
Seeking Interest and Compensation for Delay in Completion of Work |
Disposed
|
| CMP/221125/0010401 |
2022-11-25 |
monthly rental |
Disposed
|
| CMP/221116/0010352 |
2022-11-16 |
Compensation for Delay |
Disposed
|
| CMP/221116/0010351 |
2022-11-16 |
Monthly compensation for delayed |
Disposed
|
| CMP/221116/0010350 |
2022-11-16 |
flat not completed as per the terms of the sale agreement |
Disposed
|
| CMP/221116/0010349 |
2022-11-16 |
flat not competed as per the terms of the sale agreement |
Disposed
|
| CMP/221116/0010344 |
2022-11-16 |
As of now its nearly 4 years delay and demand for compensation from the date of expiry of agreement till the handover ...need compensation with the intrest |
Disposed
|
| CMP/221115/0010333 |
2022-11-15 |
Complaint for delayed possession of residential property |
Disposed
|
| CMP/221115/0010327 |
2022-11-15 |
Flats not handed over even after 6 months of committed date |
Disposed
|
| CMP/221114/0010325 |
2022-11-14 |
Flats not handed over even after 6 months of committed date |
Disposed
|
| CMP/221114/0010275 |
2022-11-14 |
Flats not handed over even after 6 months of committed date |
Disposed
|
| CMP/221114/0010274 |
2022-11-14 |
Flats not handed over even after 6 months of committed date |
Disposed
|
| CMP/221114/0010271 |
2022-11-14 |
Demand for compensation as it's been more than 1 year delay since the date of completion and delivery |
Disposed
|
| CMP/221112/0010260 |
2022-11-12 |
As of now more than one year delay in possession . Hence builder has to pay compensation |
Disposed
|
| CMP/221112/0010259 |
2022-11-12 |
DELIVERY DATE EXPIRY |
Disposed
|
| CMP/221112/0010258 |
2022-11-12 |
DELIVERY DATE EXPIRY |
Disposed
|
| CMP/221112/0010256 |
2022-11-12 |
Compensation of interest for delayed project for over 3 years and still no sign completion |
Disposed
|
| CMP/221112/0010255 |
2022-11-12 |
Compensation for delay in delivery of the flat for approx. 3 years |
Disposed
|
| CMP/221112/0010245 |
2022-11-12 |
Seeking interest and compensation for delay in completion of work |
Disposed
|
| CMP/221110/0010243 |
2022-11-10 |
Compensation of Delayed Delivery |
Disposed
|
| CMP/221110/0010236 |
2022-11-10 |
Compensation for the delay as perRera provisions, from the agreement delivery date. |
Disposed
|
| CMP/221110/0010235 |
2022-11-10 |
Handing over possession with delayed interest |
Disposed
|
| CMP/221110/0010234 |
2022-11-10 |
Handing over possession with interest on delay. |
Disposed
|
| CMP/221109/0010233 |
2022-11-09 |
Compensation For Delayed Delivery |
Disposed
|
| CMP/221109/0010229 |
2022-11-09 |
As of now, more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/221107/0010189 |
2022-11-07 |
As of now close to 3 years delay in possession and demand for compensation |
Disposed
|
| CMP/221107/0010188 |
2022-11-07 |
Delay in handing over of property and seeking compensation for delay in handover of Property |
Disposed
|
| CMP/221107/0010187 |
2022-11-07 |
Delay in handing over of property and seeking compensation for delay in handover of Property |
Disposed
|
| CMP/221104/0010184 |
2022-11-04 |
Delay in delivery of possession |
Disposed
|
| CMP/221104/0010183 |
2022-11-04 |
Delayed in handing over possession |
Disposed
|
| CMP/221104/0010178 |
2022-11-04 |
Compensation For Delayed Delivery |
Disposed
|
| CMP/221103/0010166 |
2022-11-03 |
Compensation for Delayed Delivery |
Disposed
|
| CMP/221103/0010165 |
2022-11-03 |
delivery date is extended |
Disposed
|
| CMP/221102/0010161 |
2022-11-02 |
Compensation of Delayed Delivery |
Disposed
|
| CMP/221020/0010116 |
2022-10-20 |
Delay in handing over of property |
Disposed
|
| CMP/221020/0010115 |
2022-10-20 |
Delay in handing over of property |
Disposed
|
| CMP/221020/0010114 |
2022-10-20 |
Delay in delivery of the apartment - Maple C 402. |
Disposed
|
| CMP/221013/0010099 |
2022-10-13 |
Exit with complete refund of the total amount paid along with delay compensation |
Disposed
|
| CMP/221010/0010080 |
2022-10-10 |
Compensation for Delayed Delivery |
Disposed
|
| CMP/221010/0010075 |
2022-10-10 |
Compensation For Delayed Delivery |
Disposed
|
| CMP/221010/0010074 |
2022-10-10 |
Compensation of Delayed Delivery |
Disposed
|
| CMP/221010/0010072 |
2022-10-10 |
COMPENSATION FOR DEALYED DELIVERY |
Disposed
|
| CMP/221010/0010071 |
2022-10-10 |
Compensation for delayed delivery |
Disposed
|
| CMP/220829/0009959 |
2022-08-29 |
Compensation for delay in delivery of possession |
Disposed
|
| CMP/220820/0009922 |
2022-08-20 |
Request for compensation for delay of MAPLE FLAT NO MA2403 |
Disposed
|
| CMP/220818/0009908 |
2022-08-18 |
Delayed project |
Disposed
|
| CMP/220816/0009896 |
2022-08-16 |
RETURN OF AMOUNT AND COMPENSATION IN FULL |
Disposed
|
| CMP/220816/0009893 |
2022-08-16 |
Property was supposed to be hand handed over by Dec 2020. There is a delay in possession. Hence seeking for compensation and interest |
Disposed
|
| CMP/220813/0009890 |
2022-08-13 |
DELIVERY DATE DELAYED BEYOND JUNE 2020 |
Disposed
|
| CMP/220812/0009887 |
2022-08-12 |
As of now more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220812/0009886 |
2022-08-12 |
As of now more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220812/0009885 |
2022-08-12 |
As of now more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220812/0009883 |
2022-08-12 |
Delay in Possession |
Disposed
|
| CMP/220812/0009882 |
2022-08-12 |
non delivery of flat as per comletion date of 30/6/2020 |
Disposed
|
| CMP/220811/0009880 |
2022-08-11 |
Delay in possession |
Disposed
|
| CMP/220811/0009879 |
2022-08-11 |
compensation for delay in handover |
Disposed
|
| CMP/220811/0009878 |
2022-08-11 |
Compensation for Delay in Consturciton as per Agreement |
Disposed
|
| CMP/220810/0009862 |
2022-08-10 |
REQUEST FOR COMPENSATION |
Disposed
|
| CMP/220810/0009861 |
2022-08-10 |
DELAY IN POSSESSION |
Disposed
|
| CMP/220804/0009852 |
2022-08-04 |
REQUEST FOR COMPENSATION |
Disposed
|
| CMP/220804/0009850 |
2022-08-04 |
More than Years of delay in possession and demand of compensation |
Disposed
|
| CMP/220725/0009808 |
2022-07-25 |
Delay in Delivery seeking interest compensation |
Disposed
|
| CMP/220725/0009797 |
2022-07-25 |
Delayed in completion |
Disposed
|
| CMP/220721/0009787 |
2022-07-21 |
Compensation for Delay |
Disposed
|
| CMP/220720/0009778 |
2022-07-20 |
Completion Period per RERA Act is delayed and seeking Compensation for the delay |
Disposed
|
| CMP/220713/0009742 |
2022-07-13 |
Delay in Delivery |
Disposed
|
| CMP/220708/0009732 |
2022-07-08 |
Delay in Delivery |
Disposed
|
| CMP/220706/0009719 |
2022-07-06 |
Delay in completion |
Disposed
|
| CMP/220702/0009712 |
2022-07-02 |
Delay Compensation for delay in delivery of Apartment |
Disposed
|
| CMP/220701/0009709 |
2022-07-01 |
No construction activity/No concrete response from Builder for more than 3yrs |
Disposed
|
| CMP/220629/0009702 |
2022-06-29 |
Gross Delay in delivery of apartment |
Disposed
|
| CMP/220628/0009697 |
2022-06-28 |
Project Delayed by 30 Months |
Disposed
|
| CMP/220625/0009692 |
2022-06-25 |
Handing over possession with delayed interest |
Disposed
|
| CMP/220625/0009689 |
2022-06-25 |
Possession of flat delayed |
Disposed
|
| CMP/220625/0009688 |
2022-06-25 |
As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with interest |
Disposed
|
| CMP/220625/0009687 |
2022-06-25 |
DELAY MORE THAN THREE YEARS |
Disposed
|
| CMP/220625/0009686 |
2022-06-25 |
Compensation for delay of delivery of Apartment MA 1202 |
Disposed
|
| CMP/220625/0009685 |
2022-06-25 |
AS OF NOW, MORWE THAN TWO YEARS DELAY IN POSSESSION AND DEMAND FOR COMPENSATION |
Disposed
|
| CMP/220625/0009684 |
2022-06-25 |
Handing over possession with delayed interest |
Disposed
|
| CMP/220624/0009683 |
2022-06-24 |
AS OF NOW, MORE THAN 2 YEARS DELAY IN POSSESION AND DEMAND FOR COMPENSATION |
Disposed
|
| CMP/220624/0009682 |
2022-06-24 |
DELAY IN PROJECT & DEMANDING COMPENSATION |
Disposed
|
| CMP/220624/0009678 |
2022-06-24 |
As of now more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220624/0009676 |
2022-06-24 |
Handing over possession with delayed interest |
Disposed
|
| CMP/220624/0009674 |
2022-06-24 |
Handing over possession with delayed interest |
Disposed
|
| CMP/220624/0009673 |
2022-06-24 |
Handing over possession with delayed interest |
Disposed
|
| CMP/220623/0009669 |
2022-06-23 |
Non Delivery of the Apartment Flat within the date agreed |
Disposed
|
| CMP/220623/0009668 |
2022-06-23 |
Delay in possession and demand for compensation |
Disposed
|
| CMP/220623/0009667 |
2022-06-23 |
18 - Return of amount and compensation |
Disposed
|
| CMP/220623/0009665 |
2022-06-23 |
Delayed Delivery of the Flat |
Disposed
|
| CMP/220623/0009664 |
2022-06-23 |
Delay in project delivery as promised in Advertisement and Agreement . |
Disposed
|
| CMP/220623/0009663 |
2022-06-23 |
DELAYED DELIVERY OF FLAT |
Disposed
|
| CMP/220622/0009656 |
2022-06-22 |
project delay |
Disposed
|
| CMP/220622/0009653 |
2022-06-22 |
Claiming for compensation |
Disposed
|
| CMP/220622/0009652 |
2022-06-22 |
POSSESSION AND COMPENSATION |
Disposed
|
| CMP/220621/0009650 |
2022-06-21 |
Delay in Project by more than 2.5 Yrs |
Disposed
|
| CMP/220616/0009644 |
2022-06-16 |
Delay in Delivery of apartment in the project Parkwest - Maple - Tower 4 Ref : P RM/KA/R E RA/ 1 251 I 31 0 I PR/1 7 I 0 1 5/0 0027 7 |
Disposed
|
| CMP/220616/0009643 |
2022-06-16 |
AS OF NOW 2 YEAR 4 MONTH DELAYED IN POSSESSION & DEMAND FOR COMPENSATION |
Disposed
|
| CMP/220615/0009639 |
2022-06-15 |
Apartment Handover Delayed |
Disposed
|
| CMP/220615/0009636 |
2022-06-15 |
Delay in completion of Maple Tower 4 |
Disposed
|
| CMP/220614/0009629 |
2022-06-14 |
Delivery Date Expired. Project Delayed. |
Disposed
|
| CMP/220614/0009626 |
2022-06-14 |
Delivery date delayed |
Disposed
|
| CMP/220614/0009625 |
2022-06-14 |
As of now more than 2.5 years delay. We demand early completion, compensation, Enquiry by a commission, audit of their accounts. |
Disposed
|
| CMP/220613/0009622 |
2022-06-13 |
Possession is delayed by more than 2 years as of today and the demand for compensation |
Disposed
|
| CMP/220613/0009621 |
2022-06-13 |
As of now more than 15 months delay in possession and demand for compensation |
Disposed
|
| CMP/220613/0009620 |
2022-06-13 |
Allotted apartment not delivered even after due date expired 2 years ago |
Disposed
|
| CMP/220613/0009618 |
2022-06-13 |
The Purchasers have been allotted an apartment in the year 2019 and the statutory delivery date was December 30th 2020, but the developer has not handed delivery till now and has not completed |
Disposed
|
| CMP/220613/0009615 |
2022-06-13 |
Delay in completion of the Maple Project |
Disposed
|
| CMP/220610/0009610 |
2022-06-10 |
Exit with full and final settlement with interest |
Disposed
|
| CMP/220608/0009603 |
2022-06-08 |
Delayed Possession and Compensation |
Disposed
|
| CMP/220608/0009602 |
2022-06-08 |
delaying completion of MA 702, doubt towards quality construction, |
Disposed
|
| CMP/220608/0009601 |
2022-06-08 |
Refund of Unit booked in Parkwest Maple MA-001, builder collected advance amt under speed payment and failed to honor the handover time |
Disposed
|
| CMP/220604/0009588 |
2022-06-04 |
Project delayed causing financial and mental stress |
Disposed
|
| CMP/220603/0009582 |
2022-06-03 |
EXTREME DELAY IN HANDING OVER THE FLAT MA306, MAPLE TOWER, PARKWEST 2 |
Disposed
|
| CMP/220603/0009581 |
2022-06-03 |
Parkwest Maple possession is being delayed |
Disposed
|
| CMP/220603/0009579 |
2022-06-03 |
Delay in delivery of the apartment |
Disposed
|
| CMP/220603/0009578 |
2022-06-03 |
Compensation |
Disposed
|
| CMP/220603/0009577 |
2022-06-03 |
EXPIRY OF DELIVERY DATE - DEC-31-2019 |
Disposed
|
| CMP/220602/0009575 |
2022-06-02 |
DELAY IN POSSESSION AND COMPENSATION |
Disposed
|
| CMP/220602/0009574 |
2022-06-02 |
Delay in Possession of unit MA1005 |
Disposed
|
| CMP/220602/0009573 |
2022-06-02 |
Delay in handing over of property and seeking compensation for delay in handover of Property AND SPEEDY PAYMENT MADE COMPENSATION OF FLAT NO- MB 1903 |
Disposed
|
| CMP/220601/0009566 |
2022-06-01 |
As of now, more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220601/0009562 |
2022-06-01 |
Delivery date was December 2019, Project is not yet completed and pending for possession. |
Disposed
|
| CMP/220601/0009561 |
2022-06-01 |
THE PROJECT DELAYED NO COMPENSATION YET PAID NOR DELIVERY DATE CONFIRMED |
Disposed
|
| CMP/220601/0009558 |
2022-06-01 |
Request Compensation Due to delay In Possession |
Disposed
|
| CMP/220531/0009557 |
2022-05-31 |
As of now, more than 2 years delay in possession and demand for compensation. |
Disposed
|
| CMP/220531/0009551 |
2022-05-31 |
Non delivery of the flat |
Disposed
|
| CMP/220530/0009548 |
2022-05-30 |
As of now more than 2 years delay in possession and looking for compensation |
Disposed
|
| CMP/220530/0009545 |
2022-05-30 |
Delay in delivery |
Disposed
|
| CMP/220530/0009542 |
2022-05-30 |
Delay in Handover of Flat and Compensation |
Disposed
|
| CMP/220526/0009536 |
2022-05-26 |
DELAY COMPENSATION AT 18% INTEREST FROM JANUARY2020 TILL DATE OF POSSESSION, ON TOTAL AMOUNT PAID BY ME |
Disposed
|
| CMP/220525/0009531 |
2022-05-25 |
Project Delayed by over 29 months |
Disposed
|
| CMP/220524/0009521 |
2022-05-24 |
Hudge Delay in Completion of the project |
Disposed
|
| CMP/220523/0009509 |
2022-05-23 |
Huge delay in completion of Building or Tower |
Disposed
|
| CMP/220520/0009501 |
2022-05-20 |
As of now, more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220520/0009500 |
2022-05-20 |
MISREPRESENTATION OF DATE OF DELIVERTY |
Disposed
|
| CMP/220520/0009494 |
2022-05-20 |
Delay in possession and demand for compensation |
Disposed
|
| CMP/220518/0009482 |
2022-05-18 |
COMPENSATION FOR DELAYED DELIVERY AND COMPLETION OF FLAT ASAP |
Disposed
|
| CMP/220517/0009479 |
2022-05-17 |
Delivery of delayed project and interest for delay along with suitable compensation |
Disposed
|
| CMP/220517/0009474 |
2022-05-17 |
COMPENSATION & POSSESSION OF FLAT |
Disposed
|
| CMP/220516/0009470 |
2022-05-16 |
Compensation for delay unit and timely posession of my apartment |
Disposed
|
| CMP/220507/0009429 |
2022-05-07 |
Project Delayed for more than 2 years hence requesting refund along with interest and damages |
Disposed
|
| CMP/220504/0009422 |
2022-05-04 |
Possession Delayed by 2 years and demand for compensation |
Disposed
|
| CMP/220430/0009397 |
2022-04-30 |
Unreasonable delay - Since Dec 2020/ No clear commitment on delivery as dates keep changing . |
Disposed
|
| CMP/220426/0009381 |
2022-04-26 |
More than 2 years of delay in possession and demand for compensation |
Disposed
|
| CMP/220421/0009379 |
2022-04-21 |
Delay in possession and demand for compensation |
Disposed
|
| CMP/220416/0009363 |
2022-04-16 |
As of now, more then 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220416/0009362 |
2022-04-16 |
Delivery Date Expiry |
Disposed
|
| CMP/220416/0009358 |
2022-04-16 |
As per the sale agreement possession date December 2019 |
Disposed
|
| CMP/220411/0009337 |
2022-04-11 |
Material deviation of Agreement. Ownership change without intimation to customer |
Disposed
|
| CMP/220411/0009336 |
2022-04-11 |
Delay in handing over of property and seeking compensation for delay in handover of Property MB1003 |
Disposed
|
| CMP/220408/0009328 |
2022-04-08 |
Project Delayed and hence requesting refund along with interest and other damages |
Disposed
|
| CMP/220404/0009309 |
2022-04-04 |
Project delivery delayed by over a year |
Disposed
|
| CMP/220401/0009303 |
2022-04-01 |
Delay in delivery of project and no visibility of end date, demand of compensation |
Disposed
|
| CMP/220401/0009302 |
2022-04-01 |
Huge delay in Construction completion so reqire compensation |
Disposed
|
| CMP/220329/0009276 |
2022-03-29 |
Compensation due to delay in Delivery |
Disposed
|
| CMP/220329/0009275 |
2022-03-29 |
extended delay |
Disposed
|
| CMP/220328/0009262 |
2022-03-28 |
I have booked 1 bhk flat and delivery was supposed to be given in December 2019 and till now same is not given. I am seeking compensation for delay in delivery.rs.20,000 per month from Jan 2020 |
Disposed
|
| CMP/220328/0009261 |
2022-03-28 |
As of now more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220328/0009259 |
2022-03-28 |
No construction progress. Not providing clarification even after multiple reminders. Communicating faulty status and forging lies. Keeping customers in dark; not giving explanation |
Disposed
|
| CMP/220324/0009251 |
2022-03-24 |
As of now, more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220324/0009245 |
2022-03-24 |
Delay in handing over complete project |
Disposed
|
| CMP/220322/0009235 |
2022-03-22 |
MA203 Flat at parkwest binnypet, delayed handing over. As per agreement project to be handed over on Dec2019. But till now not handed over to me. |
Disposed
|
| CMP/220322/0009234 |
2022-03-22 |
delay in handing over of apartment and seeking compensation for delay in handover of property. flat no-MB703 |
Disposed
|
| CMP/220321/0009232 |
2022-03-21 |
Delay in possession of flat |
Disposed
|
| CMP/220321/0009230 |
2022-03-21 |
Completion of development works + Formation of Association and compliance to the Act |
Disposed
|
| CMP/220321/0009220 |
2022-03-21 |
Delayed Delivery and Pending Compensation |
Disposed
|
| CMP/220321/0009219 |
2022-03-21 |
Delay in possession and demand for compensation |
Disposed
|
| CMP/220321/0009202 |
2022-03-21 |
Delivery of delayed project and interest for delay along with suitable compensation |
Disposed
|
| CMP/220321/0009201 |
2022-03-21 |
Heavy delay from Contract Agreement delivery |
Disposed
|
| CMP/220321/0009194 |
2022-03-21 |
More than 2 years delay in handing over the flat . No compensation paid . No confirmation on registration date . |
Disposed
|
| CMP/220321/0009193 |
2022-03-21 |
As of now , more than 2 years delay in possession and demand for compensation . |
Disposed
|
| CMP/220321/0009176 |
2022-03-21 |
FAIR COMPENSATION AND EARLY HANDOVER OF FLAT |
Disposed
|
| CMP/220321/0009174 |
2022-03-21 |
Delay in Possession by more than two years DEc 2019 |
Disposed
|
| CMP/220321/0009172 |
2022-03-21 |
COMPENSATION |
Disposed
|
| CMP/220318/0009153 |
2022-03-18 |
DELAY IN POSSESSION |
Disposed
|
| CMP/220318/0009152 |
2022-03-18 |
DELAY IN POSSESSION |
Disposed
|
| CMP/220318/0009151 |
2022-03-18 |
DELAY IN POSSESSION |
Disposed
|
| CMP/220316/0009143 |
2022-03-16 |
As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with interest |
Disposed
|
| CMP/220316/0009141 |
2022-03-16 |
As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with intrest |
Disposed
|
| CMP/220316/0009140 |
2022-03-16 |
Delay in handing over of property and seeking compensation for delay in handover of Property |
Disposed
|
| CMP/220316/0009137 |
2022-03-16 |
Delay in Handover - Breach of Agreement Clause with respect to committed delivery date |
Disposed
|
| CMP/220316/0009136 |
2022-03-16 |
More than 2 years Delay in possession and demand for Compensation |
Disposed
|
| CMP/220316/0009135 |
2022-03-16 |
More than 2 years Delay in possession and demand for Compensation |
Disposed
|
| CMP/220316/0009131 |
2022-03-16 |
FAIR COMPENSATION AND EARLY HANDOVER OF FLAT |
Disposed
|
| CMP/220314/0009124 |
2022-03-14 |
compensation |
Disposed
|
| CMP/220314/0009119 |
2022-03-14 |
Delivery of delayed project and interest for delay along with suitable compensation |
Disposed
|
| CMP/220314/0009117 |
2022-03-14 |
More than two years of delay in delivery and demand for compensation |
Disposed
|
| CMP/220310/0009109 |
2022-03-10 |
Delay in Construction and Cheating by Builder |
Disposed
|
| CMP/220310/0009106 |
2022-03-10 |
Delay in delivery of the Flat and compensation |
Disposed
|
| CMP/220310/0009104 |
2022-03-10 |
Unreasonable delay in the delivery of the project |
Disposed
|
| CMP/220309/0009098 |
2022-03-09 |
Return of amount andcompensation in full |
Disposed
|
| CMP/220309/0009092 |
2022-03-09 |
Compensation for delay in delivery of apartment |
Disposed
|
| CMP/220304/0009071 |
2022-03-04 |
Around 2 years delay from committed possession date and hence demand for compensation over and above interest for payment done |
Disposed
|
| CMP/220304/0009070 |
2022-03-04 |
Demand for refund of amount with interest for the delay of 2years |
Disposed
|
| CMP/220304/0009069 |
2022-03-04 |
Delivery Date Expiry |
Disposed
|
| CMP/220218/0009029 |
2022-02-18 |
Delay compensation as per RERA |
Disposed
|
| CMP/220218/0009025 |
2022-02-18 |
Monthly compensation for delayed |
Disposed
|
| CMP/220215/0009015 |
2022-02-15 |
Unreasonable delay - Since Dec 2019 / No clear commitment on delivery as dates keep changing emails/ |
Disposed
|
| CMP/220207/0008983 |
2022-02-07 |
Delay in handing over of my flat MA003 in Maple tower of Parkwest Project & no compensation commitment |
Disposed
|
| CMP/220122/0008855 |
2022-01-22 |
As of now, more than 2 years delay in possession and demand for compensation |
Disposed
|
| CMP/220122/0008852 |
2022-01-22 |
Delivery delayed, no responses to queries about delivery and compensation |
Disposed
|
| CMP/220121/0008849 |
2022-01-21 |
Unreasonable delay : Since Dec 2019 /No clear committment on delivery even now/No committment on compensation/No response to our emails |
Disposed
|
| CMP/220121/0008848 |
2022-01-21 |
Compensation and Pocession of flat |
Disposed
|
| CMP/220120/0008844 |
2022-01-20 |
Delay in delivery of ParkWest Maple - tower 4 |
Disposed
|
| CMP/220120/0008843 |
2022-01-20 |
Possession Delayed by 4 years - Compensation Required |
Disposed
|
| CMP/211202/0008670 |
2021-12-02 |
Mis-selling and Wrong delivery date committed by developer without giving any compensation till date |
Disposed
|
| CMP/211126/0008637 |
2021-11-26 |
Delivery Delayed , Compensation for the Delay as per agreement |
Disposed
|
| CMP/211109/0008529 |
2021-11-09 |
delay in delivery of flat and no updates on compensation |
Disposed
|
| CMP/211109/0008528 |
2021-11-09 |
Continuous delayed in Delivery of project |
Disposed
|
| CMP/211031/0008509 |
2021-10-31 |
Delay in Handover of Project |
Disposed
|
| CMP/211028/0008495 |
2021-10-28 |
DELAY IN COMPLETION OF PROJECT |
Disposed
|
| CMP/211028/0008494 |
2021-10-28 |
Inordinate delay of the delivery of the flat. No clarity on compensating for the delay |
Disposed
|
| CMP/211019/0008449 |
2021-10-19 |
Delay in completion and handover of flat as promised in Advertisement and Agreement |
Disposed
|
| CMP/211012/0008434 |
2021-10-12 |
fast delivery of the flat and compensation for the delay |
Disposed
|
| CMP/211012/0008433 |
2021-10-12 |
Not honoring commitment to delivery date of Dec 2019 as per agreement 100% payment taken |
Disposed
|
| CMP/211008/0008419 |
2021-10-08 |
Compensation for delivery date expiry |
Disposed
|
| CMP/210802/0008196 |
2021-08-02 |
Delay in Completion of Project |
Disposed
|
| CMP/210704/0008094 |
2021-07-04 |
Promise vs. Delivery |
Disposed
|
| CMP/210408/0007875 |
2021-04-08 |
VIolation of RERA Act, lack of transparency |
Disposed
|
| CMP/210406/0007871 |
2021-04-06 |
Delay in payment of subvention in |
Disposed
|
| CMP/210302/0007717 |
2021-03-02 |
DELIVERY DATE OF EXPIRY (DEC 2019) |
Disposed
|
| CMP/210225/0007695 |
2021-02-25 |
Not sharing project MIS for more than 1 year; Misrepresentation |
Disposed
|
| CMP/210223/0007643 |
2021-02-23 |
Flat is not handed over as per the due date - December 2019 |
Disposed
|
| CMP/210209/0007566 |
2021-02-09 |
Compensation for the delay as per Rera provisions, from the agreement delivery date. |
Disposed
|
| CMP/210208/0007581 |
2021-02-08 |
Delay in handing over of property |
Disposed
|
| CMP/210206/0007583 |
2021-02-06 |
Delay in completion and handover of flat |
Disposed
|
| CMP/210202/0007564 |
2021-02-02 |
Reneging on commitments repeatedly, attempt to misguide, threatening behavior and mental harassment |
Disposed
|
| CMP/210111/0007415 |
2021-01-11 |
DELAY IN DELVERY OF FLAT |
Disposed
|
| CMP/210109/0007424 |
2021-01-09 |
Not honoring commitment to delivery date of Dec 2019 as per agreement 100% payment taken |
Disposed
|
| CMP/210104/0007389 |
2021-01-04 |
Delivery date expiry |
Disposed
|
| CMP/210102/0007370 |
2021-01-02 |
Compensation for delayed delivery |
Disposed
|
| CMP/201224/0007318 |
2020-12-24 |
Breach of Agreement |
Disposed
|
| CMP/201224/0007316 |
2020-12-24 |
Delay in completion & Handover |
Disposed
|
| CMP/201223/0007133 |
2020-12-23 |
Delay in Handover Date |
Disposed
|
| CMP/201218/0007242 |
2020-12-18 |
Attempted fraud, attempted financial irregularity, non disclosure of material information under Section 15(A) (iii) and mental harassment |
Disposed
|
| CMP/201130/0007140 |
2020-11-30 |
Delay of 18 months to hand over possession of the Apartment |
Disposed
|
| CMP/201127/0007136 |
2020-11-27 |
Breach of Agreement and non response to previous complaint |
Disposed
|
| CMP/201107/0007032 |
2020-11-07 |
No construction activity/No concrete response from Builder |
Disposed
|
| CMP/201011/0006814 |
2020-10-11 |
POSSESSION PENDING |
Disposed
|
| CMP/201010/0006812 |
2020-10-10 |
Delay in Project Delivery as promised in Advertisement and Agrement |
Disposed
|
| CMP/201010/0006804 |
2020-10-10 |
Delay in apartment unit and amenities handover as committed in the Agreemetn |
Disposed
|
| CMP/201009/0006794 |
2020-10-09 |
Delay in Project Delivery as promised in Advertisement and Agrement |
Disposed
|
| CMP/190311/0002422 |
2019-03-11 |
Refund of booking amount and GST amount paid, along with interest and compensation, to revoke the registration granted by RERA |
Disposed
|
| CMP/190311/0002417 |
2019-03-11 |
Refund of Booking amount with GST along with interest and compensation, For revokation of RERA registration granted to the promoter |
Disposed
|