Projects / Parkwest - Maple - Tower 4

Parkwest - Maple - Tower 4

Bengaluru Urban · Relationship Properties Private Limited PRM/KA/RERA/1251/310/PR/180122/004645
3 complaints · 75% built
Filed — · Q4 2025-26
Construction
75%
complete
Sold
225
of 225 total units
Available
0
units
1 BHK: 0
2 BHK: 0
2.5 BHK: 0
3 BHK: 0
Complaints
3
on project · 398 on builder
Construction progress
% complete per quarter
Sales velocity
Units sold per quarter · cumulative booked (line)
Inventory drain
Available units over time
Show financial data (advance collected vs withdrawn)
Quarterly financials
₹ Crore — advance collected vs amount withdrawn this quarter

Quarter-wise Tower Data

Filed: 2026-04-15 · Project 75% complete
CEDAR 75% complete
Unit type Total Booked Available
1 BHK 31 31 0
1 BHK 31 31 0
2 BHK 33 33 0
2 BHK 33 33 0
2.5 BHK 64 64 0
2.5 BHK 64 64 0
3 BHK 97 97 0
3 BHK 97 97 0
Parking 273 225 48
Floor completion
Floor 0
61.0%
Floor 1
61.0%
Floor 2
62.0%
Floor 3
62.0%
Floor 4
62.0%
Floor 5
61.0%
Floor 6
61.0%
Floor 7
59.0%
Floor 8
59.0%
Floor 9
59.0%
Floor 10
58.0%
Floor 11
56.0%
Floor 12
56.0%
Floor 13
56.0%
Floor 14
56.0%
Floor 15
56.0%
Floor 16
56.0%
Floor 17
52.0%
Floor 18
52.0%
Floor 19
52.0%
Floor 20
52.0%
Floor 21
52.0%
Floor 22
52.0%
Floor 23
52.0%
Floor 24
52.0%
Floor 25
51.0%
Floor 26
50.0%
Floor 27
50.0%
Floor 28
50.0%
Floor 29
50.0%
Floor 30
50.0%
Floor 31
50.0%
Floor 32
50.0%

Unit Specifications

Unit type Carpet area (sqft) Units
1 BHK 470 62
2 BHK 757 66
2.5 BHK 964–969 128
3 BHK 1,174–1,197 194
Show escrow account details
Escrow Accounts
Bank
HDFC
Branch
RAJAJINAGAR DR RAJKUMAR ROAD
IFSC
HDFC0004000
70% Collection A/C
57500000469020

Project details

Registration no.
PRM/KA/RERA/1251/310/PR/180122/004645
District
Bengaluru Urban
Taluk
Bengaluru South
Promoter
Relationship Properties Private Limited
Firm type
Company
PAN
AADCR8947D
GSTIN
29AADCR8947D1Z0
Total units
225
Total cost
₹268.29 Cr
Project start
2022-03-01
FAR sanctioned
0.1814
Proposed completion
2026-12-31
Project address
"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"

Complaint History 311 complaints

Complaint no. Filed Subject Status
CMP/221230/0010589 2022-12-30 Flats not handed over even after 7 months of committed date Disposed
CMP/221230/0010585 2022-12-30 Flats not handed over even after 7 months of committed date Disposed
CMP/221229/0010580 2022-12-29 Flats not handed over even after 7 months of committed date Disposed
CMP/221229/0010579 2022-12-29 Flats not handed over even after 7 months of committed date Disposed
CMP/221229/0010576 2022-12-29 Flats not handed over even after 7 months of committed date Disposed
CMP/221229/0010575 2022-12-29 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010570 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010569 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010568 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010567 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010566 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010564 2022-12-28 Flats not handed over even after 8 months of committed date Disposed
CMP/221228/0010563 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010562 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010561 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010560 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010559 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010558 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010557 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010556 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010555 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010554 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010553 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010552 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010551 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010550 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010549 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010548 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010547 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010546 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010545 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010544 2022-12-28 Flats not handed over even after 7 months of committed date Disposed
CMP/221228/0010543 2022-12-28 Delay in Hand over (Occupancy) Disposed
CMP/221226/0010525 2022-12-26 Compensation for delay on position Disposed
CMP/221226/0010517 2022-12-26 Refund of entire amount with interest Disposed
CMP/221222/0010512 2022-12-22 PROJECT PROGRESS IS NOT IN LINE TO MEET THE JAN2023 EXTENSION FROM RERA (PRM/KA/RERA/1251/310/PR/180222/002637) Disposed
CMP/221220/0010487 2022-12-20 Flats not handed over even after 7 months of committed date Disposed
CMP/221220/0010484 2022-12-20 Delay in handover of property and exceptional loss due to interest on loans taken Disposed
CMP/221217/0010477 2022-12-17 Compensation for delay in handover and immediate possession of the property Disposed
CMP/221217/0010476 2022-12-17 Delay of 3 years in possession. As of now more than 3 years delay in possession and demand for compensation Disposed
CMP/221216/0010464 2022-12-16 REQUEEST FOR COMPENSATION Disposed
CMP/221215/0010461 2022-12-15 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010460 2022-12-12 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010459 2022-12-12 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010458 2022-12-12 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010457 2022-12-12 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010456 2022-12-12 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010455 2022-12-12 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010454 2022-12-12 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010453 2022-12-12 Flats not handed over even after 7 months of committed date Disposed
CMP/221212/0010452 2022-12-12 Delay in giving posession with false hopes Disposed
CMP/221212/0010451 2022-12-12 Delay in giving posession Disposed
CMP/221212/0010449 2022-12-12 Delay of Possession since promised date of December 2019 and Demand for Compensation Disposed
CMP/221209/0010444 2022-12-09 Delay of Possession since December 2019 and Demand for Compensation Disposed
CMP/221207/0010436 2022-12-07 Flats not handed over even after 7 months of committed date POSTED FOR ORDERS AUTHORITY FULLBENCH
CMP/221207/0010434 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010433 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010432 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010431 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010430 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010429 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010428 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010427 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010426 2022-12-07 Flats not handed over even after 7 months of committed date Disposed
CMP/221207/0010425 2022-12-07 Delay in Possession for more than 33 months Disposed
CMP/221205/0010420 2022-12-05 Delay in handing over completed flat to me in Maple block Disposed
CMP/221130/0010415 2022-11-30 Seeking Compensation for Inordinate Delays in Construction and Handover Disposed
CMP/221125/0010403 2022-11-25 Seeking Interest and Compensation for Delay in Completion of Work Disposed
CMP/221125/0010401 2022-11-25 monthly rental Disposed
CMP/221116/0010352 2022-11-16 Compensation for Delay Disposed
CMP/221116/0010351 2022-11-16 Monthly compensation for delayed Disposed
CMP/221116/0010350 2022-11-16 flat not completed as per the terms of the sale agreement Disposed
CMP/221116/0010349 2022-11-16 flat not competed as per the terms of the sale agreement Disposed
CMP/221116/0010344 2022-11-16 As of now its nearly 4 years delay and demand for compensation from the date of expiry of agreement till the handover ...need compensation with the intrest Disposed
CMP/221115/0010333 2022-11-15 Complaint for delayed possession of residential property Disposed
CMP/221115/0010327 2022-11-15 Flats not handed over even after 6 months of committed date Disposed
CMP/221114/0010325 2022-11-14 Flats not handed over even after 6 months of committed date Disposed
CMP/221114/0010275 2022-11-14 Flats not handed over even after 6 months of committed date Disposed
CMP/221114/0010274 2022-11-14 Flats not handed over even after 6 months of committed date Disposed
CMP/221114/0010271 2022-11-14 Demand for compensation as it's been more than 1 year delay since the date of completion and delivery Disposed
CMP/221112/0010260 2022-11-12 As of now more than one year delay in possession . Hence builder has to pay compensation Disposed
CMP/221112/0010259 2022-11-12 DELIVERY DATE EXPIRY Disposed
CMP/221112/0010258 2022-11-12 DELIVERY DATE EXPIRY Disposed
CMP/221112/0010256 2022-11-12 Compensation of interest for delayed project for over 3 years and still no sign completion Disposed
CMP/221112/0010255 2022-11-12 Compensation for delay in delivery of the flat for approx. 3 years Disposed
CMP/221112/0010245 2022-11-12 Seeking interest and compensation for delay in completion of work Disposed
CMP/221110/0010243 2022-11-10 Compensation of Delayed Delivery Disposed
CMP/221110/0010236 2022-11-10 Compensation for the delay as perRera provisions, from the agreement delivery date. Disposed
CMP/221110/0010235 2022-11-10 Handing over possession with delayed interest Disposed
CMP/221110/0010234 2022-11-10 Handing over possession with interest on delay. Disposed
CMP/221109/0010233 2022-11-09 Compensation For Delayed Delivery Disposed
CMP/221109/0010229 2022-11-09 As of now, more than 2 years delay in possession and demand for compensation Disposed
CMP/221107/0010189 2022-11-07 As of now close to 3 years delay in possession and demand for compensation Disposed
CMP/221107/0010188 2022-11-07 Delay in handing over of property and seeking compensation for delay in handover of Property Disposed
CMP/221107/0010187 2022-11-07 Delay in handing over of property and seeking compensation for delay in handover of Property Disposed
CMP/221104/0010184 2022-11-04 Delay in delivery of possession Disposed
CMP/221104/0010183 2022-11-04 Delayed in handing over possession Disposed
CMP/221104/0010178 2022-11-04 Compensation For Delayed Delivery Disposed
CMP/221103/0010166 2022-11-03 Compensation for Delayed Delivery Disposed
CMP/221103/0010165 2022-11-03 delivery date is extended Disposed
CMP/221102/0010161 2022-11-02 Compensation of Delayed Delivery Disposed
CMP/221020/0010116 2022-10-20 Delay in handing over of property Disposed
CMP/221020/0010115 2022-10-20 Delay in handing over of property Disposed
CMP/221020/0010114 2022-10-20 Delay in delivery of the apartment - Maple C 402. Disposed
CMP/221013/0010099 2022-10-13 Exit with complete refund of the total amount paid along with delay compensation Disposed
CMP/221010/0010080 2022-10-10 Compensation for Delayed Delivery Disposed
CMP/221010/0010075 2022-10-10 Compensation For Delayed Delivery Disposed
CMP/221010/0010074 2022-10-10 Compensation of Delayed Delivery Disposed
CMP/221010/0010072 2022-10-10 COMPENSATION FOR DEALYED DELIVERY Disposed
CMP/221010/0010071 2022-10-10 Compensation for delayed delivery Disposed
CMP/220829/0009959 2022-08-29 Compensation for delay in delivery of possession Disposed
CMP/220820/0009922 2022-08-20 Request for compensation for delay of MAPLE FLAT NO MA2403 Disposed
CMP/220818/0009908 2022-08-18 Delayed project Disposed
CMP/220816/0009896 2022-08-16 RETURN OF AMOUNT AND COMPENSATION IN FULL Disposed
CMP/220816/0009893 2022-08-16 Property was supposed to be hand handed over by Dec 2020. There is a delay in possession. Hence seeking for compensation and interest Disposed
CMP/220813/0009890 2022-08-13 DELIVERY DATE DELAYED BEYOND JUNE 2020 Disposed
CMP/220812/0009887 2022-08-12 As of now more than 2 years delay in possession and demand for compensation Disposed
CMP/220812/0009886 2022-08-12 As of now more than 2 years delay in possession and demand for compensation Disposed
CMP/220812/0009885 2022-08-12 As of now more than 2 years delay in possession and demand for compensation Disposed
CMP/220812/0009883 2022-08-12 Delay in Possession Disposed
CMP/220812/0009882 2022-08-12 non delivery of flat as per comletion date of 30/6/2020 Disposed
CMP/220811/0009880 2022-08-11 Delay in possession Disposed
CMP/220811/0009879 2022-08-11 compensation for delay in handover Disposed
CMP/220811/0009878 2022-08-11 Compensation for Delay in Consturciton as per Agreement Disposed
CMP/220810/0009862 2022-08-10 REQUEST FOR COMPENSATION Disposed
CMP/220810/0009861 2022-08-10 DELAY IN POSSESSION Disposed
CMP/220804/0009852 2022-08-04 REQUEST FOR COMPENSATION Disposed
CMP/220804/0009850 2022-08-04 More than Years of delay in possession and demand of compensation Disposed
CMP/220725/0009808 2022-07-25 Delay in Delivery seeking interest compensation Disposed
CMP/220725/0009797 2022-07-25 Delayed in completion Disposed
CMP/220721/0009787 2022-07-21 Compensation for Delay Disposed
CMP/220720/0009778 2022-07-20 Completion Period per RERA Act is delayed and seeking Compensation for the delay Disposed
CMP/220713/0009742 2022-07-13 Delay in Delivery Disposed
CMP/220708/0009732 2022-07-08 Delay in Delivery Disposed
CMP/220706/0009719 2022-07-06 Delay in completion Disposed
CMP/220702/0009712 2022-07-02 Delay Compensation for delay in delivery of Apartment Disposed
CMP/220701/0009709 2022-07-01 No construction activity/No concrete response from Builder for more than 3yrs Disposed
CMP/220629/0009702 2022-06-29 Gross Delay in delivery of apartment Disposed
CMP/220628/0009697 2022-06-28 Project Delayed by 30 Months Disposed
CMP/220625/0009692 2022-06-25 Handing over possession with delayed interest Disposed
CMP/220625/0009689 2022-06-25 Possession of flat delayed Disposed
CMP/220625/0009688 2022-06-25 As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with interest Disposed
CMP/220625/0009687 2022-06-25 DELAY MORE THAN THREE YEARS Disposed
CMP/220625/0009686 2022-06-25 Compensation for delay of delivery of Apartment MA 1202 Disposed
CMP/220625/0009685 2022-06-25 AS OF NOW, MORWE THAN TWO YEARS DELAY IN POSSESSION AND DEMAND FOR COMPENSATION Disposed
CMP/220625/0009684 2022-06-25 Handing over possession with delayed interest Disposed
CMP/220624/0009683 2022-06-24 AS OF NOW, MORE THAN 2 YEARS DELAY IN POSSESION AND DEMAND FOR COMPENSATION Disposed
CMP/220624/0009682 2022-06-24 DELAY IN PROJECT & DEMANDING COMPENSATION Disposed
CMP/220624/0009678 2022-06-24 As of now more than 2 years delay in possession and demand for compensation Disposed
CMP/220624/0009676 2022-06-24 Handing over possession with delayed interest Disposed
CMP/220624/0009674 2022-06-24 Handing over possession with delayed interest Disposed
CMP/220624/0009673 2022-06-24 Handing over possession with delayed interest Disposed
CMP/220623/0009669 2022-06-23 Non Delivery of the Apartment Flat within the date agreed Disposed
CMP/220623/0009668 2022-06-23 Delay in possession and demand for compensation Disposed
CMP/220623/0009667 2022-06-23 18 - Return of amount and compensation Disposed
CMP/220623/0009665 2022-06-23 Delayed Delivery of the Flat Disposed
CMP/220623/0009664 2022-06-23 Delay in project delivery as promised in Advertisement and Agreement . Disposed
CMP/220623/0009663 2022-06-23 DELAYED DELIVERY OF FLAT Disposed
CMP/220622/0009656 2022-06-22 project delay Disposed
CMP/220622/0009653 2022-06-22 Claiming for compensation Disposed
CMP/220622/0009652 2022-06-22 POSSESSION AND COMPENSATION Disposed
CMP/220621/0009650 2022-06-21 Delay in Project by more than 2.5 Yrs Disposed
CMP/220616/0009644 2022-06-16 Delay in Delivery of apartment in the project Parkwest - Maple - Tower 4 Ref : P RM/KA/R E RA/ 1 251 I 31 0 I PR/1 7 I 0 1 5/0 0027 7 Disposed
CMP/220616/0009643 2022-06-16 AS OF NOW 2 YEAR 4 MONTH DELAYED IN POSSESSION & DEMAND FOR COMPENSATION Disposed
CMP/220615/0009639 2022-06-15 Apartment Handover Delayed Disposed
CMP/220615/0009636 2022-06-15 Delay in completion of Maple Tower 4 Disposed
CMP/220614/0009629 2022-06-14 Delivery Date Expired. Project Delayed. Disposed
CMP/220614/0009626 2022-06-14 Delivery date delayed Disposed
CMP/220614/0009625 2022-06-14 As of now more than 2.5 years delay. We demand early completion, compensation, Enquiry by a commission, audit of their accounts. Disposed
CMP/220613/0009622 2022-06-13 Possession is delayed by more than 2 years as of today and the demand for compensation Disposed
CMP/220613/0009621 2022-06-13 As of now more than 15 months delay in possession and demand for compensation Disposed
CMP/220613/0009620 2022-06-13 Allotted apartment not delivered even after due date expired 2 years ago Disposed
CMP/220613/0009618 2022-06-13 The Purchasers have been allotted an apartment in the year 2019 and the statutory delivery date was December 30th 2020, but the developer has not handed delivery till now and has not completed Disposed
CMP/220613/0009615 2022-06-13 Delay in completion of the Maple Project Disposed
CMP/220610/0009610 2022-06-10 Exit with full and final settlement with interest Disposed
CMP/220608/0009603 2022-06-08 Delayed Possession and Compensation Disposed
CMP/220608/0009602 2022-06-08 delaying completion of MA 702, doubt towards quality construction, Disposed
CMP/220608/0009601 2022-06-08 Refund of Unit booked in Parkwest Maple MA-001, builder collected advance amt under speed payment and failed to honor the handover time Disposed
CMP/220604/0009588 2022-06-04 Project delayed causing financial and mental stress Disposed
CMP/220603/0009582 2022-06-03 EXTREME DELAY IN HANDING OVER THE FLAT MA306, MAPLE TOWER, PARKWEST 2 Disposed
CMP/220603/0009581 2022-06-03 Parkwest Maple possession is being delayed Disposed
CMP/220603/0009579 2022-06-03 Delay in delivery of the apartment Disposed
CMP/220603/0009578 2022-06-03 Compensation Disposed
CMP/220603/0009577 2022-06-03 EXPIRY OF DELIVERY DATE - DEC-31-2019 Disposed
CMP/220602/0009575 2022-06-02 DELAY IN POSSESSION AND COMPENSATION Disposed
CMP/220602/0009574 2022-06-02 Delay in Possession of unit MA1005 Disposed
CMP/220602/0009573 2022-06-02 Delay in handing over of property and seeking compensation for delay in handover of Property AND SPEEDY PAYMENT MADE COMPENSATION OF FLAT NO- MB 1903 Disposed
CMP/220601/0009566 2022-06-01 As of now, more than 2 years delay in possession and demand for compensation Disposed
CMP/220601/0009562 2022-06-01 Delivery date was December 2019, Project is not yet completed and pending for possession. Disposed
CMP/220601/0009561 2022-06-01 THE PROJECT DELAYED NO COMPENSATION YET PAID NOR DELIVERY DATE CONFIRMED Disposed
CMP/220601/0009558 2022-06-01 Request Compensation Due to delay In Possession Disposed
CMP/220531/0009557 2022-05-31 As of now, more than 2 years delay in possession and demand for compensation. Disposed
CMP/220531/0009551 2022-05-31 Non delivery of the flat Disposed
CMP/220530/0009548 2022-05-30 As of now more than 2 years delay in possession and looking for compensation Disposed
CMP/220530/0009545 2022-05-30 Delay in delivery Disposed
CMP/220530/0009542 2022-05-30 Delay in Handover of Flat and Compensation Disposed
CMP/220526/0009536 2022-05-26 DELAY COMPENSATION AT 18% INTEREST FROM JANUARY2020 TILL DATE OF POSSESSION, ON TOTAL AMOUNT PAID BY ME Disposed
CMP/220525/0009531 2022-05-25 Project Delayed by over 29 months Disposed
CMP/220524/0009521 2022-05-24 Hudge Delay in Completion of the project Disposed
CMP/220523/0009509 2022-05-23 Huge delay in completion of Building or Tower Disposed
CMP/220520/0009501 2022-05-20 As of now, more than 2 years delay in possession and demand for compensation Disposed
CMP/220520/0009500 2022-05-20 MISREPRESENTATION OF DATE OF DELIVERTY Disposed
CMP/220520/0009494 2022-05-20 Delay in possession and demand for compensation Disposed
CMP/220518/0009482 2022-05-18 COMPENSATION FOR DELAYED DELIVERY AND COMPLETION OF FLAT ASAP Disposed
CMP/220517/0009479 2022-05-17 Delivery of delayed project and interest for delay along with suitable compensation Disposed
CMP/220517/0009474 2022-05-17 COMPENSATION & POSSESSION OF FLAT Disposed
CMP/220516/0009470 2022-05-16 Compensation for delay unit and timely posession of my apartment Disposed
CMP/220507/0009429 2022-05-07 Project Delayed for more than 2 years hence requesting refund along with interest and damages Disposed
CMP/220504/0009422 2022-05-04 Possession Delayed by 2 years and demand for compensation Disposed
CMP/220430/0009397 2022-04-30 Unreasonable delay - Since Dec 2020/ No clear commitment on delivery as dates keep changing . Disposed
CMP/220426/0009381 2022-04-26 More than 2 years of delay in possession and demand for compensation Disposed
CMP/220421/0009379 2022-04-21 Delay in possession and demand for compensation Disposed
CMP/220416/0009363 2022-04-16 As of now, more then 2 years delay in possession and demand for compensation Disposed
CMP/220416/0009362 2022-04-16 Delivery Date Expiry Disposed
CMP/220416/0009358 2022-04-16 As per the sale agreement possession date December 2019 Disposed
CMP/220411/0009337 2022-04-11 Material deviation of Agreement. Ownership change without intimation to customer Disposed
CMP/220411/0009336 2022-04-11 Delay in handing over of property and seeking compensation for delay in handover of Property MB1003 Disposed
CMP/220408/0009328 2022-04-08 Project Delayed and hence requesting refund along with interest and other damages Disposed
CMP/220404/0009309 2022-04-04 Project delivery delayed by over a year Disposed
CMP/220401/0009303 2022-04-01 Delay in delivery of project and no visibility of end date, demand of compensation Disposed
CMP/220401/0009302 2022-04-01 Huge delay in Construction completion so reqire compensation Disposed
CMP/220329/0009276 2022-03-29 Compensation due to delay in Delivery Disposed
CMP/220329/0009275 2022-03-29 extended delay Disposed
CMP/220328/0009262 2022-03-28 I have booked 1 bhk flat and delivery was supposed to be given in December 2019 and till now same is not given. I am seeking compensation for delay in delivery.rs.20,000 per month from Jan 2020 Disposed
CMP/220328/0009261 2022-03-28 As of now more than 2 years delay in possession and demand for compensation Disposed
CMP/220328/0009259 2022-03-28 No construction progress. Not providing clarification even after multiple reminders. Communicating faulty status and forging lies. Keeping customers in dark; not giving explanation Disposed
CMP/220324/0009251 2022-03-24 As of now, more than 2 years delay in possession and demand for compensation Disposed
CMP/220324/0009245 2022-03-24 Delay in handing over complete project Disposed
CMP/220322/0009235 2022-03-22 MA203 Flat at parkwest binnypet, delayed handing over. As per agreement project to be handed over on Dec2019. But till now not handed over to me. Disposed
CMP/220322/0009234 2022-03-22 delay in handing over of apartment and seeking compensation for delay in handover of property. flat no-MB703 Disposed
CMP/220321/0009232 2022-03-21 Delay in possession of flat Disposed
CMP/220321/0009230 2022-03-21 Completion of development works + Formation of Association and compliance to the Act Disposed
CMP/220321/0009220 2022-03-21 Delayed Delivery and Pending Compensation Disposed
CMP/220321/0009219 2022-03-21 Delay in possession and demand for compensation Disposed
CMP/220321/0009202 2022-03-21 Delivery of delayed project and interest for delay along with suitable compensation Disposed
CMP/220321/0009201 2022-03-21 Heavy delay from Contract Agreement delivery Disposed
CMP/220321/0009194 2022-03-21 More than 2 years delay in handing over the flat . No compensation paid . No confirmation on registration date . Disposed
CMP/220321/0009193 2022-03-21 As of now , more than 2 years delay in possession and demand for compensation . Disposed
CMP/220321/0009176 2022-03-21 FAIR COMPENSATION AND EARLY HANDOVER OF FLAT Disposed
CMP/220321/0009174 2022-03-21 Delay in Possession by more than two years DEc 2019 Disposed
CMP/220321/0009172 2022-03-21 COMPENSATION Disposed
CMP/220318/0009153 2022-03-18 DELAY IN POSSESSION Disposed
CMP/220318/0009152 2022-03-18 DELAY IN POSSESSION Disposed
CMP/220318/0009151 2022-03-18 DELAY IN POSSESSION Disposed
CMP/220316/0009143 2022-03-16 As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with interest Disposed
CMP/220316/0009141 2022-03-16 As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with intrest Disposed
CMP/220316/0009140 2022-03-16 Delay in handing over of property and seeking compensation for delay in handover of Property Disposed
CMP/220316/0009137 2022-03-16 Delay in Handover - Breach of Agreement Clause with respect to committed delivery date Disposed
CMP/220316/0009136 2022-03-16 More than 2 years Delay in possession and demand for Compensation Disposed
CMP/220316/0009135 2022-03-16 More than 2 years Delay in possession and demand for Compensation Disposed
CMP/220316/0009131 2022-03-16 FAIR COMPENSATION AND EARLY HANDOVER OF FLAT Disposed
CMP/220314/0009124 2022-03-14 compensation Disposed
CMP/220314/0009119 2022-03-14 Delivery of delayed project and interest for delay along with suitable compensation Disposed
CMP/220314/0009117 2022-03-14 More than two years of delay in delivery and demand for compensation Disposed
CMP/220310/0009109 2022-03-10 Delay in Construction and Cheating by Builder Disposed
CMP/220310/0009106 2022-03-10 Delay in delivery of the Flat and compensation Disposed
CMP/220310/0009104 2022-03-10 Unreasonable delay in the delivery of the project Disposed
CMP/220309/0009098 2022-03-09 Return of amount andcompensation in full Disposed
CMP/220309/0009092 2022-03-09 Compensation for delay in delivery of apartment Disposed
CMP/220304/0009071 2022-03-04 Around 2 years delay from committed possession date and hence demand for compensation over and above interest for payment done Disposed
CMP/220304/0009070 2022-03-04 Demand for refund of amount with interest for the delay of 2years Disposed
CMP/220304/0009069 2022-03-04 Delivery Date Expiry Disposed
CMP/220218/0009029 2022-02-18 Delay compensation as per RERA Disposed
CMP/220218/0009025 2022-02-18 Monthly compensation for delayed Disposed
CMP/220215/0009015 2022-02-15 Unreasonable delay - Since Dec 2019 / No clear commitment on delivery as dates keep changing emails/ Disposed
CMP/220207/0008983 2022-02-07 Delay in handing over of my flat MA003 in Maple tower of Parkwest Project & no compensation commitment Disposed
CMP/220122/0008855 2022-01-22 As of now, more than 2 years delay in possession and demand for compensation Disposed
CMP/220122/0008852 2022-01-22 Delivery delayed, no responses to queries about delivery and compensation Disposed
CMP/220121/0008849 2022-01-21 Unreasonable delay : Since Dec 2019 /No clear committment on delivery even now/No committment on compensation/No response to our emails Disposed
CMP/220121/0008848 2022-01-21 Compensation and Pocession of flat Disposed
CMP/220120/0008844 2022-01-20 Delay in delivery of ParkWest Maple - tower 4 Disposed
CMP/220120/0008843 2022-01-20 Possession Delayed by 4 years - Compensation Required Disposed
CMP/211202/0008670 2021-12-02 Mis-selling and Wrong delivery date committed by developer without giving any compensation till date Disposed
CMP/211126/0008637 2021-11-26 Delivery Delayed , Compensation for the Delay as per agreement Disposed
CMP/211109/0008529 2021-11-09 delay in delivery of flat and no updates on compensation Disposed
CMP/211109/0008528 2021-11-09 Continuous delayed in Delivery of project Disposed
CMP/211031/0008509 2021-10-31 Delay in Handover of Project Disposed
CMP/211028/0008495 2021-10-28 DELAY IN COMPLETION OF PROJECT Disposed
CMP/211028/0008494 2021-10-28 Inordinate delay of the delivery of the flat. No clarity on compensating for the delay Disposed
CMP/211019/0008449 2021-10-19 Delay in completion and handover of flat as promised in Advertisement and Agreement Disposed
CMP/211012/0008434 2021-10-12 fast delivery of the flat and compensation for the delay Disposed
CMP/211012/0008433 2021-10-12 Not honoring commitment to delivery date of Dec 2019 as per agreement 100% payment taken Disposed
CMP/211008/0008419 2021-10-08 Compensation for delivery date expiry Disposed
CMP/210802/0008196 2021-08-02 Delay in Completion of Project Disposed
CMP/210704/0008094 2021-07-04 Promise vs. Delivery Disposed
CMP/210408/0007875 2021-04-08 VIolation of RERA Act, lack of transparency Disposed
CMP/210406/0007871 2021-04-06 Delay in payment of subvention in Disposed
CMP/210302/0007717 2021-03-02 DELIVERY DATE OF EXPIRY (DEC 2019) Disposed
CMP/210225/0007695 2021-02-25 Not sharing project MIS for more than 1 year; Misrepresentation Disposed
CMP/210223/0007643 2021-02-23 Flat is not handed over as per the due date - December 2019 Disposed
CMP/210209/0007566 2021-02-09 Compensation for the delay as per Rera provisions, from the agreement delivery date. Disposed
CMP/210208/0007581 2021-02-08 Delay in handing over of property Disposed
CMP/210206/0007583 2021-02-06 Delay in completion and handover of flat Disposed
CMP/210202/0007564 2021-02-02 Reneging on commitments repeatedly, attempt to misguide, threatening behavior and mental harassment Disposed
CMP/210111/0007415 2021-01-11 DELAY IN DELVERY OF FLAT Disposed
CMP/210109/0007424 2021-01-09 Not honoring commitment to delivery date of Dec 2019 as per agreement 100% payment taken Disposed
CMP/210104/0007389 2021-01-04 Delivery date expiry Disposed
CMP/210102/0007370 2021-01-02 Compensation for delayed delivery Disposed
CMP/201224/0007318 2020-12-24 Breach of Agreement Disposed
CMP/201224/0007316 2020-12-24 Delay in completion & Handover Disposed
CMP/201223/0007133 2020-12-23 Delay in Handover Date Disposed
CMP/201218/0007242 2020-12-18 Attempted fraud, attempted financial irregularity, non disclosure of material information under Section 15(A) (iii) and mental harassment Disposed
CMP/201130/0007140 2020-11-30 Delay of 18 months to hand over possession of the Apartment Disposed
CMP/201127/0007136 2020-11-27 Breach of Agreement and non response to previous complaint Disposed
CMP/201107/0007032 2020-11-07 No construction activity/No concrete response from Builder Disposed
CMP/201011/0006814 2020-10-11 POSSESSION PENDING Disposed
CMP/201010/0006812 2020-10-10 Delay in Project Delivery as promised in Advertisement and Agrement Disposed
CMP/201010/0006804 2020-10-10 Delay in apartment unit and amenities handover as committed in the Agreemetn Disposed
CMP/201009/0006794 2020-10-09 Delay in Project Delivery as promised in Advertisement and Agrement Disposed
CMP/190311/0002422 2019-03-11 Refund of booking amount and GST amount paid, along with interest and compensation, to revoke the registration granted by RERA Disposed
CMP/190311/0002417 2019-03-11 Refund of Booking amount with GST along with interest and compensation, For revokation of RERA registration granted to the promoter Disposed

Frequently Asked Questions

Based on K-RERA registered data for Parkwest - Maple - Tower 4
Is Parkwest - Maple - Tower 4 RERA registered in Karnataka?

Yes. Parkwest - Maple - Tower 4 is registered with the Karnataka Real Estate Regulatory Authority (K-RERA) under registration number PRM/KA/RERA/1251/310/PR/180122/004645.

What is the RERA registration number of Parkwest - Maple - Tower 4?

The K-RERA registration number of Parkwest - Maple - Tower 4 is PRM/KA/RERA/1251/310/PR/180122/004645.

What is the current construction status of Parkwest - Maple - Tower 4?

As of Q4 2025-26, Parkwest - Maple - Tower 4 is 75% complete according to its latest K-RERA quarterly filing.

Are flats still available in Parkwest - Maple - Tower 4?

As per the latest K-RERA filing (Q4 2025-26), Parkwest - Maple - Tower 4 is sold out — no units are currently listed as available.

How many flats have been sold in Parkwest - Maple - Tower 4?

As per the latest K-RERA filing (Q4 2025-26), 225 out of 225 units in Parkwest - Maple - Tower 4 have been sold or booked.

Are there any RERA complaints against Parkwest - Maple - Tower 4?

Yes. Parkwest - Maple - Tower 4 has 3 complaint(s) filed against it on the K-RERA portal. Review these on the official K-RERA website before making a purchase decision.

How many RERA complaints does Relationship Properties Private Limited have?

Relationship Properties Private Limited, the builder/promoter of Parkwest - Maple - Tower 4, has 398 complaint(s) filed against them across all their K-RERA registered projects in Karnataka.

Who is the builder or developer of Parkwest - Maple - Tower 4?

Parkwest - Maple - Tower 4 is developed by Relationship Properties Private Limited, a company registered with K-RERA in Bengaluru Urban, Karnataka.

When did Parkwest - Maple - Tower 4 last file a quarterly update with K-RERA?

Parkwest - Maple - Tower 4 last filed a quarterly update for Q4 2025-26 on 2026-04-15. The project has submitted 2 quarterly report(s) on K-RERA to date.