Projects / ADARSH TRANQVILLE
+ Compare with another project

ADARSH TRANQVILLE

Bengaluru Urban PRM/KA/RERA/1251/446/PR/181210/002211
Delivered · 100% built
Filed — · Q4 2025-26
Fund safety: no flags
Construction
100%
complete
Sold
9
of ? total units
Available
0
units
1 BHK: 8
3.5 BHK: 0
4 BHK: 0
Complaints
2
on project · 4 on builder
Construction progress
% complete per quarter
Sales velocity
Units sold per quarter · cumulative booked (line)
Inventory drain
Available units over time
Show financial data (advance collected vs withdrawn)
Quarterly financials
₹ Crore — advance collected vs amount withdrawn this quarter

Quarter-wise Tower Data

Filed: 2026-04-15 · Project 100% complete
1 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
10.0%
Floor 1
100.0%
Floor 2
100.0%
100 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
101 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
103 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
104 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
105 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
106 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
11 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
13 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
14 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
15 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
17 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
18 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
19 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
21 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
23 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
26 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
28 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
29 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
3 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
31 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
32 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
33 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
34 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
37 100% complete
Unit type Total Booked Available
3.5 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
38 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
40 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
41 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
43 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
44 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
45 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
46 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
47 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
48 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
49 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
5 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
50 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
51 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
56 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
57 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
58 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
59 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
6 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
61 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
62 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
63 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
64 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
65 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
67 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
68 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
69 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
7 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
70 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
71 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
72 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
73 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
75 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
78 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
8 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
99.0%
Floor 2
99.0%
80 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
83 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
84 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
87 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
88 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
89 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
90 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
92 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
93 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
94 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
95 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
97 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
98 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
99 100% complete
Unit type Total Booked Available
4 BHK 1 1 0
Parking 2 2 —
Floor completion
Floor 0
100.0%
Floor 1
100.0%
Floor 2
100.0%
PLOT NO 60 0% complete
Unit type Total Booked Available
1 BHK 8 — 8
Parking 1 — 1
Floor completion
Floor 0
0.0%
Floor 1
0.0%
Floor 2
0.0%

Unit Specifications

Unit type Carpet area (sqft) Units
1 BHK 270–311 8 Estimate ROI →
3.5 BHK 2,179–2,200 10 Estimate ROI →
4 BHK 2,681–3,199 63 Estimate ROI →
Show escrow account details
Escrow Accounts
Bank
HDFC
Branch
Richmond Road
IFSC
HDFC0000523
70% Collection A/C
57500000176474

Registration Extension Extension granted

Promoters can apply for a Section 6 extensionA formal application under RERA Section 6 for more time to complete the project, requiring a stated reason — distinct from the automatic, government-wide Covid extension every project received. when they can't meet the originally registered completion date.

Promoter's stated reason for delay: others

Event Start date Proposed completion
At the time of Registration 2018-06-01 2020-08-31 Certificate →
Covid Extension 2020-08-31 2021-05-31 Certificate →
Section 6 Extension 2021-02-28 2022-02-28 Certificate →
Further Extension 2022-05-31 2026-03-06 Certificate →
Extension applied on
2020-11-30
Extension approved on
2021-02-19
Extension registration no.
EX/PRM/KA/RERA/1251/446/PR/210219/002211

Registry Details

Want the latest sale-deed / registration status for this project? Our team will look it up for you.

Project details

Registration no.
PRM/KA/RERA/1251/446/PR/181210/002211
District
Bengaluru Urban
Taluk
Bengaluru East
Project start
2018-06-01
FAR sanctioned
0.786
Land area
617,186 sqft
Proposed completion
2022-05-31
Project address
SY NO. 92,95/1, 95/2, CHIKKAGUBBI VILLAGE, Bidarahalli Hobli

Buyer Risk Report 2 complaints

2 complaints on file from this project's K-RERA quarterly filings.

Sign in free — no password — to see exactly which quarters and complaints triggered these flags.

Sign in to see full details →
Show documents on file with K-RERA (72)
Documents on file
Government NOCs
BESCOM (electricity) not found
BWSSB (water & sewerage) not found
Fire NOC not found
KSPCB (pollution control) on file
SEIAA (environmental clearance) on file
Airport / Air Force NOC not found
Telecom (BSNL) NOC not found
Lift license not found
RERA statutory forms
Form-1 (project registration) not found
Form-2/3 (CA certificate) not found
Form-B / Sec 3(1) affidavit on file
Company KYC
Certificate of incorporation on file
GST certificate not found
PAN card not found
Partnership deed / firm registration not found
Promoter financials
6 on file
Legal / land documents
10 on file
Other documents
25 on file · 6 marked not available
Plan approvals
8 on file
Sale/allotment documents
4 on file
Site photographs
3 on file
Technical certificates
5 on file
Inventory of documents the promoter has uploaded to their K-RERA project page — not a review of their contents. "Not found" means no filed document matched that item by name; it doesn't necessarily apply to every project (e.g. an airport-proximity NOC).

Frequently Asked Questions

Based on K-RERA registered data for ADARSH TRANQVILLE
Is ADARSH TRANQVILLE RERA registered in Karnataka?

Yes. ADARSH TRANQVILLE is registered with the Karnataka Real Estate Regulatory Authority (K-RERA) under registration number PRM/KA/RERA/1251/446/PR/181210/002211.

What is the RERA registration number of ADARSH TRANQVILLE?

The K-RERA registration number of ADARSH TRANQVILLE is PRM/KA/RERA/1251/446/PR/181210/002211.

What is the current construction status of ADARSH TRANQVILLE?

As of Q4 2025-26, ADARSH TRANQVILLE is 100% complete — construction has finished according to its latest K-RERA quarterly filing.

Are flats still available in ADARSH TRANQVILLE?

As per the latest K-RERA filing (Q4 2025-26), ADARSH TRANQVILLE is sold out — no units are currently listed as available.

Are 1 BHK flats available in ADARSH TRANQVILLE?

Yes. According to the latest K-RERA quarterly filing, there are 8 1 BHK unit(s) available in ADARSH TRANQVILLE, Bengaluru Urban.

Are there any RERA complaints against ADARSH TRANQVILLE?

Yes. ADARSH TRANQVILLE has 2 complaint(s) filed against it on the K-RERA portal. Review these on the official K-RERA website before making a purchase decision.

When did ADARSH TRANQVILLE last file a quarterly update with K-RERA?

ADARSH TRANQVILLE last filed a quarterly update for Q4 2025-26 on 2026-04-15. The project has submitted 2 quarterly report(s) on K-RERA to date.