| CMP/220328/0009272 |
2022-03-28 |
Refund for T9-202 |
Disposed
|
| CMP/210720/0008144 |
2021-07-20 |
Violation under section 4 |
Disposed
|
| CMP/210614/0007996 |
2021-06-14 |
Refund of advance paid along with total outstanding to loan account , and compensation |
Disposed
|
| CMP/210601/0007972 |
2021-06-01 |
Breach of agreement,Fraud |
Disposed
|
| CMP/210529/0007966 |
2021-05-29 |
Refund and compensation |
Disposed
|
| CMP/210302/0007719 |
2021-03-02 |
Refund of flat booked amount and Pre EMI |
POSTED FOR ORDERS AUTHORITY FULLBENCH
|
| CMP/210302/0007714 |
2021-03-02 |
Refund of flat booked amount and Pre EMI |
Disposed
|
| CMP/210219/0007647 |
2021-02-19 |
Refund of flat booked amount and Pre EMI |
POSTED FOR ORDERS AUTHORITY FULLBENCH
|
| CMP/210218/0007614 |
2021-02-18 |
Refund of advance , claim opportunity cost, cloasing of loan |
Disposed
|
| CMP/210215/0007641 |
2021-02-15 |
Refund and Compensation from SKylark Ithaca |
Disposed
|
| CMP/210201/0007549 |
2021-02-01 |
refund and exit from the project SKYLARK ITHAKA |
Disposed
|
| CMP/210108/0006055 |
2021-01-08 |
Refund of Amount As per the Exit Clause Agreed with the Builder and Bankruptcy Filled by the Builder |
Disposed
|
| CMP/201103/0007006 |
2020-11-03 |
Refund, Compensation and Cancellation of Agreement |
Disposed
|
| CMP/200902/0006496 |
2020-09-02 |
Refund of Booking amount |
Disposed
|
| CMP/200829/0006326 |
2020-08-29 |
Non-completion of project evenafter delay of 3 yrs + non-payment of pre-emi as per sub-version agreemment |
Disposed
|
| CMP/200824/0006348 |
2020-08-24 |
Exit/ Withdraw from the project, refund and compensation |
Disposed
|
| CMP/200824/0006256 |
2020-08-24 |
Exit from the project and Compensation |
Disposed
|
| CMP/200823/0006402 |
2020-08-23 |
Breach of Agreement and non remittance of PRE-EMI |
Disposed
|
| CMP/200816/0006330 |
2020-08-16 |
Exit from project, seeking compensation and closure of loan, reimbursement of PRE-EMi etc |
Disposed
|
| CMP/200720/0006239 |
2020-07-20 |
Cancellation of Agreement, compensation for delay in possession |
Disposed
|
| CMP/200713/0006138 |
2020-07-13 |
Breach of Builder Buyer Agreement, Refund and Compensation |
Disposed
|
| CMP/200706/0006123 |
2020-07-06 |
Exit from the project and refund |
Disposed
|
| CMP/200606/0005054 |
2020-06-06 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/200310/0005648 |
2020-03-10 |
Delay of more than 2.5 years for possession of the flat |
Disposed
|
| CMP/200304/0004416 |
2020-03-04 |
Complainant entered into an agreement of sale to purchase of flat bearing No.T7-504, on 5th floor of Tower T7 of Skylark Itahaca vide sale Agreement dated 5th June, 2014 |
Disposed
|
| CMP/200224/0005455 |
2020-02-24 |
Refund and Injection for Home Loan |
Disposed
|
| CMP/200220/0004353 |
2020-02-20 |
Delivery Date Expiry |
Disposed
|
| CMP/200210/0005402 |
2020-02-10 |
Refund of booking against Cancellation not done |
Disposed
|
| CMP/200203/0005368 |
2020-02-03 |
for cancellation and refund of entire amount along with interest and opportunity cost under Exit Option MOU |
Disposed
|
| CMP/200203/0005358 |
2020-02-03 |
for cancellation and refund of entire amount along with interest and opportunity cost under Exit Option MOU |
Disposed
|
| CMP/200128/0005302 |
2020-01-28 |
Non-delivery of the flat on the scheduled date |
Disposed
|
| CMP/200119/0004644 |
2020-01-19 |
Exit Option Agreement breached and Reimbursement not done till date with foreclosure of loan. |
Disposed
|
| CMP/200111/0005187 |
2020-01-11 |
Refund of amount paid as advance and loan through bank |
Disposed
|
| CMP/200107/0005126 |
2020-01-07 |
Delay in delivery of flat , hence seeking compensation |
Disposed
|
| CMP/200103/0004797 |
2020-01-03 |
FAILED TO PAY BACK THE INTEREST AND ACTUAL AMOUNT |
Disposed
|
| CMP/191228/0005063 |
2019-12-28 |
NON-DELIVERY OF FLAT T15-102 |
Disposed
|
| CMP/191227/0004534 |
2019-12-27 |
Possession date was on 31March 2017 as per agreement. No sign of possession in near future. Want Immediate EXIT with compensation of Rs 5 crore |
Disposed
|
| CMP/191226/0005010 |
2019-12-26 |
Refund of Amount and Compensation |
Disposed
|
| CMP/191224/0005060 |
2019-12-24 |
Breach of Agreement: Refund of amount, Bank Loan takeover and Reimbursement of pending pre EMIS |
Disposed
|
| CMP/191216/0005000 |
2019-12-16 |
Exit from the project due to breach of possession date |
Disposed
|
| CMP/191216/0004998 |
2019-12-16 |
Cancellation of Agreement due to breach of delivery date |
Disposed
|
| CMP/191216/0003688 |
2019-12-16 |
Refund of flat booked amount and Pre EMI |
Disposed
|
| CMP/191214/0004987 |
2019-12-14 |
Breach of Agreement on Refund of Pre-EMI and constructions is stalled for long time and inability to exercise exit agreement |
Disposed
|
| CMP/191204/0004875 |
2019-12-04 |
Need Exit Order from Rera |
Disposed
|
| CMP/191129/0003800 |
2019-11-29 |
Reimbursement of pre EMI paid by me and Refund of Amount paid |
Disposed
|
| CMP/191121/0004783 |
2019-11-21 |
Respondents have failed to comply with the terms and conditions of the Exit option MOU dated:09.06.2016, Sale Agreement and Construction Agreement dated:09.06.2016 |
Disposed
|
| CMP/191025/0004566 |
2019-10-25 |
Cheating by skylark and need my money refunded and loan closed |
Disposed
|
| CMP/191025/0004530 |
2019-10-25 |
Request to transfer the bank loan to Builder |
Disposed
|
| CMP/191017/0004503 |
2019-10-17 |
Refund of the Consideration due to delay |
Disposed
|
| CMP/191012/0004463 |
2019-10-12 |
Delay in Construction & Flat handover |
Disposed
|
| CMP/190927/0004186 |
2019-09-27 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190925/0004191 |
2019-09-25 |
Exit from project with refund and opportunity cost |
Disposed
|
| CMP/190924/0004297 |
2019-09-24 |
Refund, and closure of bank loan , opportunity cost |
Disposed
|
| CMP/190923/0004258 |
2019-09-23 |
Refund of enitre amount and complaince of Exit option agreement |
Disposed
|
| CMP/190923/0004188 |
2019-09-23 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190923/0004185 |
2019-09-23 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190920/0004249 |
2019-09-20 |
Claim of Missing PRE EMI'S, returns and discharge of home loan if possible |
Disposed
|
| CMP/190916/0004203 |
2019-09-16 |
seeking for cancellation as per Exit Agreement and refund of enitre amount with Opportunity cost |
Disposed
|
| CMP/190909/0004158 |
2019-09-09 |
Skylark Ithaca not delivered as per sale agreement |
Disposed
|
| CMP/190907/0004144 |
2019-09-07 |
Exit Option, Amount Repayment |
Disposed
|
| CMP/190907/0004143 |
2019-09-07 |
Exit Option, Amount Repayment |
Disposed
|
| CMP/190826/0003887 |
2019-08-26 |
Exit Option, Amount Repayment |
Disposed
|
| CMP/190821/0003823 |
2019-08-21 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190817/0003612 |
2019-08-17 |
Refund of Booking amount |
Disposed
|
| CMP/190810/0003846 |
2019-08-10 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190810/0003768 |
2019-08-10 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190807/0003838 |
2019-08-07 |
Delay in delivery of flat for possession as per sale and construction agreement |
Disposed
|
| CMP/190806/0003808 |
2019-08-06 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190805/0003763 |
2019-08-05 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190805/0003703 |
2019-08-05 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190805/0003573 |
2019-08-05 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190804/0003806 |
2019-08-04 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190804/0003708 |
2019-08-04 |
Non Delivery of Apartment, Reimbursement of Per-EmiDelayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190803/0003809 |
2019-08-03 |
Refund of Agreed Amount and Pre EMI |
Disposed
|
| CMP/190803/0003522 |
2019-08-03 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190803/0003479 |
2019-08-03 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190801/0003798 |
2019-08-01 |
Cheating by skylark and need my money refunded and loan closed |
Disposed
|
| CMP/190731/0003701 |
2019-07-31 |
Non Delivery of Apartment,Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190731/0003574 |
2019-07-31 |
Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony & Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190729/0003678 |
2019-07-29 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190728/0003736 |
2019-07-28 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190725/0003706 |
2019-07-25 |
Non Delivery of Apartment, Reimbursement of PRE-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190723/0003693 |
2019-07-23 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190723/0003638 |
2019-07-23 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190722/0003672 |
2019-07-22 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190722/0003539 |
2019-07-22 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190722/0003477 |
2019-07-22 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony & Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190712/0003342 |
2019-07-12 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190711/0003523 |
2019-07-11 |
Seeking to oblige Exit Option Agreement by respondent and reimbursement of PRE EMI & refund of entire amount with interest along with opportunity cost |
Disposed
|
| CMP/190710/0002752 |
2019-07-10 |
Seeking for delay compensation |
Disposed
|
| CMP/190705/0003475 |
2019-07-05 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190702/0003409 |
2019-07-02 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190630/0003426 |
2019-06-30 |
Delay in construction and Unethical marketing techniques of Skylark Ithaca |
Disposed
|
| CMP/190630/0003370 |
2019-06-30 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190628/0003419 |
2019-06-28 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190628/0003412 |
2019-06-28 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190624/0003368 |
2019-06-24 |
Non Delivery of Apartment, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190623/0003350 |
2019-06-23 |
Exit Option, Amount Repayment |
Disposed
|
| CMP/190623/0003349 |
2019-06-23 |
Exit Option, Amount Repayment |
Disposed
|
| CMP/190623/0003324 |
2019-06-23 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190623/0003273 |
2019-06-23 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190615/0002343 |
2019-06-15 |
Non Delivery of Apartment, Delayed Compensation, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190614/0002659 |
2019-06-14 |
Delay in construction and unethical marketing technique of skylark ithaca |
Disposed
|
| CMP/190613/0003295 |
2019-06-13 |
Construction stopped and pre-emi reimbursement stopped |
Disposed
|
| CMP/190608/0003261 |
2019-06-08 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190607/0002849 |
2019-06-07 |
Penalty for indefinite delay in possession |
Disposed
|
| CMP/190603/0003227 |
2019-06-03 |
Compensation for the delay in delivery date |
Disposed
|
| CMP/190601/0003111 |
2019-06-01 |
Exit Option, Amount Repayment |
Disposed
|
| CMP/190601/0003048 |
2019-06-01 |
Exit Option, Amount Repayment and Cancellation of RERA Registration |
Disposed
|
| CMP/190530/0003207 |
2019-05-30 |
Breaching agreement of buy back offer |
Disposed
|
| CMP/190518/0003059 |
2019-05-18 |
Non Delivery of Apartment, Non payment of Pre-EMI, Delayed Compensation, Interest Refund, Damages for Mental Agony, Mental Torture and Unfair Trade Practice |
Disposed
|
| CMP/190513/0003001 |
2019-05-13 |
Exit Option, Amount Repayment and Cancellation of RERA Registration |
Disposed
|
| CMP/190509/0002961 |
2019-05-09 |
seeking for refund with interest as per RERA and oblige with Exit Option Agreement terms |
Disposed
|
| CMP/190420/0002664 |
2019-04-20 |
Seeking for Exit/ cancellation from project and refund of entire amount with interest of RERA provisions |
Disposed
|
| CMP/190411/0002574 |
2019-04-11 |
PRE EMI, Refund of agreemnt amount, bank loan amount and opportunity cost as per agreement |
Disposed
|
| CMP/190411/0002573 |
2019-04-11 |
PRE EMI, Advance amount refund and exit with opportunity cost, entire amount refund including bank loan |
Disposed
|
| CMP/190409/0002611 |
2019-04-09 |
Breach of agreement, Delivery date of expiry and Pre-EMI reimbursements failure |
Disposed
|
| CMP/190408/0002605 |
2019-04-08 |
Breach of Agreement and refund of advance, pre-emi payments along with opportunity cost and discharge of loan. |
Disposed
|
| CMP/190407/0002507 |
2019-04-07 |
Breach of agreement, Delivery date expiry and pre emi reimbursement failure |
Disposed
|
| CMP/190317/0002447 |
2019-03-17 |
cancellation of agreement, refund and reimbursement of PRE EMI as per agreements along with opportunity cost as per EXIT MOU with interest of RERA |
Disposed
|
| CMP/190317/0002445 |
2019-03-17 |
cancellation of agreement, refund of enitre amount paid by complaiants along with PRE EMI reimbursement & Opportunity cost as per EXIT MOU. |
Disposed
|
| CMP/190317/0002442 |
2019-03-17 |
claim is for cancellation of agreementrefund reimbursement of Pre EMI amount with interest at the rate of SBI Basic Prime lending rate plus 2% from the date of payment to till the date of realization. |
Disposed
|
| CMP/190317/0002441 |
2019-03-17 |
claim is forcancellation of agreemntfund & reimbursement of Pre EMI amount with interest at rate of SBI Basic Prime lending rate plus 2% from date of payment to till date of realization. |
Disposed
|
| CMP/190311/0002420 |
2019-03-11 |
Exit Option, Amount Repayment and Cancellation of RERA Registration |
Disposed
|
| CMP/190311/0002419 |
2019-03-11 |
Exit Option, Amount Repayment and Cancellation of RERA Registration |
Disposed
|
| CMP/190309/0002305 |
2019-03-09 |
Compensation for Delay in possession |
Disposed
|
| CMP/190307/0002379 |
2019-03-07 |
Exit from the agreement as per Exit agreement |
Disposed
|
| CMP/190306/0002353 |
2019-03-06 |
Delay in possession resulting financial hardship |
Disposed
|
| CMP/190228/0002141 |
2019-02-28 |
Delay in Construction of Skylark Ithaca |
Disposed
|
| CMP/190225/0002287 |
2019-02-25 |
Exit Option, Amount Repayment and Cancellation of RERA Registration |
Disposed
|
| CMP/190225/0002224 |
2019-02-25 |
Date of possession postponed to Feb 2020 |
Disposed
|
| CMP/190223/0002258 |
2019-02-23 |
DELAY IN CONSTRUCTION OF SKYLARK ITHACA |
Disposed
|
| CMP/190219/0002218 |
2019-02-19 |
Delay in Possession and no work progress |
Disposed
|
| CMP/190219/0002217 |
2019-02-19 |
Delay in possession & halted construction |
Disposed
|
| CMP/190217/0002176 |
2019-02-17 |
Exit Option, Amount Repayment and Cancellation of RERA Registration |
Disposed
|
| CMP/190216/0002145 |
2019-02-16 |
The claim is for refund and compensation with interest at the rate of SBI Basic Prime lending rate plus 2percent from the date of payment to till the date of realization. |
Disposed
|
| CMP/190212/0002122 |
2019-02-12 |
Pre emi reversal and exit option apply as per the aggrement |
Disposed
|
| CMP/190211/0002081 |
2019-02-11 |
Refund of booking amount upon cancellation |
Disposed
|
| CMP/190208/0002078 |
2019-02-08 |
compensation for delay in emi credit |
Disposed
|