Provident Park Square 5

Bengaluru Urban PRM/KA/RERA/1251/310/PR/200226/003305
2 complaints · 91% built
Filed — · Q3 2025-26
Construction
91%
complete
Sold
594
of ? total units
Available
7
units
1 BHK: 6
2 BHK: 30
3 BHK: 6
Complaints
2
on project · 107 on builder
Construction progress
% complete per quarter
Sales velocity
Units sold per quarter · cumulative booked (line)
Inventory drain
Available units over time
Show financial data (advance collected vs withdrawn)
Quarterly financials
₹ Crore — advance collected vs amount withdrawn this quarter

Quarter-wise Tower Data

Filed: 2026-03-30 · Project 91% complete
1A 100% complete
Unit type Total Booked Available
1 BHK 119 118 1
1 BHK 119 118 1
1 BHK 119 118 1
1 BHK 119 118 1
1 BHK 119 118 1
1 BHK 119 118 1
Parking 50 49 1
Floor completion
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 14
99.0%
Floor 14
99.0%
Floor 14
99.0%
Floor 14
99.0%
Floor 14
99.0%
2A 100% complete
Unit type Total Booked Available
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
3 BHK 52 51 1
3 BHK 52 51 1
3 BHK 52 51 1
3 BHK 52 51 1
3 BHK 52 51 1
3 BHK 52 51 1
Parking 104 102 2
Floor completion
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
2B 99% complete
Unit type Total Booked Available
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
Parking 104 103 1
Floor completion
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 13
99.0%
Floor 13
99.0%
Floor 13
99.0%
Floor 13
99.0%
Floor 13
99.0%
3A 100% complete
Unit type Total Booked Available
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
2 BHK 52 51 1
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
Parking 104 103 1
Floor completion
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
Floor 13
100.0%
3B 100% complete
Unit type Total Booked Available
2 BHK 52 52 0
2 BHK 52 52 0
2 BHK 52 52 0
2 BHK 52 52 0
2 BHK 52 52 0
2 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
3 BHK 52 52 0
Parking 104 104
Floor completion
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 0
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 1
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 2
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 3
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 4
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 5
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 6
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 7
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 8
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 9
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 10
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 11
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 12
100.0%
Floor 13
99.0%
Floor 13
99.0%
Floor 13
99.0%
Floor 13
99.0%
Floor 13
99.0%
Tower 6 99% complete
Unit type Total Booked Available
2 BHK 22 20 2
2 BHK 22 20 2
2 BHK 22 20 2
2 BHK 22 20 2
2 BHK 22 20 2
2 BHK 22 20 2
3 BHK 44 44 0
3 BHK 44 44 0
3 BHK 44 44 0
3 BHK 44 44 0
3 BHK 44 44 0
3 BHK 44 44 0
Parking 66 64 2
Floor completion
Floor 0
99.0%
Floor 0
99.0%
Floor 0
99.0%
Floor 0
99.0%
Floor 0
99.0%
Floor 1
99.0%
Floor 1
99.0%
Floor 1
99.0%
Floor 1
99.0%
Floor 1
99.0%
Floor 2
99.0%
Floor 2
99.0%
Floor 2
99.0%
Floor 2
99.0%
Floor 2
99.0%
Floor 3
99.0%
Floor 3
99.0%
Floor 3
99.0%
Floor 3
99.0%
Floor 3
99.0%
Floor 4
99.0%
Floor 4
99.0%
Floor 4
99.0%
Floor 4
99.0%
Floor 4
99.0%
Floor 5
99.0%
Floor 5
99.0%
Floor 5
99.0%
Floor 5
99.0%
Floor 5
99.0%
Floor 6
99.0%
Floor 6
99.0%
Floor 6
99.0%
Floor 6
99.0%
Floor 6
99.0%

Unit Specifications

Unit type Carpet area (sqft) Units
1 BHK 344–463 119 Estimate ROI →
2 BHK 591–616 230 Estimate ROI →
3 BHK 780–903 252 Estimate ROI →
Show escrow account details
Escrow Accounts
Bank
STATE BANK OF INDIA
Branch
Commercial Branch
IFSC
SBIN004196
70% Collection A/C
00000042557997428
100% A/C
00000042558000184
30% A/C
00000042558007282

Project details

Registration no.
PRM/KA/RERA/1251/310/PR/200226/003305
District
Bengaluru Urban
Taluk
Bengaluru South
Total cost
Project start
2020-01-17
FAR sanctioned
2.0
Land area
328,582 sqft
Proposed completion
2026-06-30 overdue
Project address
Sy No 3/3, 7, 8/1, 9/2A, 9/2B1, 26/1 Mallasandra Village, Uttarahalli Hobli

Complaint History 53 complaints

Complaint no. Filed Subject Status
CMP/221107/0010216 2022-11-07 REFUND OF AMOUNT PAID WITH INTEREST UPTO DATE Disposed
CMP/221103/0010174 2022-11-03 Booking Amount refund Disposed
CMP/221103/0010168 2022-11-03 No permanent boundary wall and club facility as per agreement Disposed
CMP/221101/0010153 2022-11-01 Payment request without sufficient proof of completion Disposed
CMP/221029/0010138 2022-10-29 Flat Booking Fee not refunded Disposed
CMP/220826/0009943 2022-08-26 APPROVED DOCUMENTS NOT GIVEN BY THE BUILDER FOR MORE THAN 3 YEARS. Disposed
CMP/220721/0009791 2022-07-21 Compensation for delay Disposed
CMP/220613/0009616 2022-06-13 Looking for compensation for delay Disposed
CMP/220321/0009217 2022-03-21 Refund of Booking Amount Disposed
CMP/211020/0008454 2021-10-20 Non refund of my booking amount Disposed
CMP/210821/0008260 2021-08-21 Amount not refund yet Disposed
CMP/210821/0008259 2021-08-21 Refund of the Booking Amount Disposed
CMP/210816/0008248 2021-08-16 NOT sharing complete information Disposed
CMP/210726/0008161 2021-07-26 Payment of damages Disposed
CMP/210713/0008117 2021-07-13 Requesting for the extension of the time period to pay the pending amount Disposed
CMP/210711/0008115 2021-07-11 Refund of the booking amount paid for flat # 605 at Purva Atmosphere Disposed
CMP/210630/0008075 2021-06-30 Refund of holding the property and delayed in handover Disposed
CMP/210622/0008022 2021-06-22 Restoration of apartment units Disposed
CMP/210516/0007951 2021-05-16 Refund Of Booking Amount Disposed
CMP/210505/0007943 2021-05-05 Apartment in BLOCK-3 But Car parking allotted in BLOCK-1 basement with out lift or stair access from BLOCK3 Disposed
CMP/210408/0007877 2021-04-08 Asking the advance payment for the excavation without providing the valid documents like building licence, Building plan for Phase V, allotment letter, Form V architect reports, for Phase 5-2B Tower Disposed
CMP/210310/0007775 2021-03-10 Regarding Booking Amount Refund. Disposed
CMP/210308/0007764 2021-03-08 Refund of Booking Amount Disposed
CMP/210306/0007752 2021-03-06 BUILDER NOT REFUNDING Disposed
CMP/210118/0007464 2021-01-18 Refund not given Disposed
CMP/210112/0007439 2021-01-12 Seeking refund of booking amount of Rs 200000 Disposed
CMP/201224/0007315 2020-12-24 Demanding huge delay payment fee inspite of delay from Builder Disposed
CMP/201209/0007225 2020-12-09 Payment Schedule Not revised as per Sale Agreement Date Disposed
CMP/201029/0006976 2020-10-29 Refund of booking advance Disposed
CMP/201016/0006868 2020-10-16 Non-refund of full amount of payment Disposed
CMP/200912/0006565 2020-09-12 DENIAL OF REFUND OF ADVANCE AMOUNT ON CANCELLATION BEFORE ALLOTMENT Disposed
CMP/200718/0006141 2020-07-18 Compensation for Delayed Possession Disposed
CMP/200628/0006095 2020-06-28 Complaint against Provedent Park Square- Puravankara Disposed
CMP/200331/0005816 2020-03-31 Regarding delay compensation from the month of delay (March 2019) till handing over of possession Disposed
CMP/200313/0005667 2020-03-13 PAYMENT OF COMPENSATION FOR DELAYED DELIVERY OF THE FLAT AS PER RERA RULES Disposed
CMP/200302/0005587 2020-03-02 Complaint for delay in possession & demand of addtional money Disposed
CMP/200201/0005326 2020-02-01 REFUND OF PART PAYMENT TOWARDS ADVANCE Disposed
CMP/200130/0005247 2020-01-30 Refund of the holding changes levied in violation of the Order passed pursuant to Complaint CMP/190714/0003570 Disposed
CMP/200122/0005278 2020-01-22 booked amount refund of provident park square unit no B4-4A-508 Disposed
CMP/200108/0005175 2020-01-08 Return of balance amount payable by Puravankara Limited Disposed
CMP/191227/0005089 2019-12-27 Filing Complaint against the Purvankara Limited (Project: Purva Sun flower, 236/4, Ward No.25 Ramachandrapura Disposed
CMP/190823/0003854 2019-08-23 Delivery/Possession & Registration of the Unit SFC 1902. Disposed
CMP/190805/0003715 2019-08-05 your judgment for compliant no. 775 not honored by promoter Disposed
CMP/190801/0003792 2019-08-01 Misguided and Not given what we asked the Flat,during cancelattion bulider deducted :304491. Disposed
CMP/190731/0003677 2019-07-31 Builder not paying the penalty for delayed possession & Inturn asking for Interest payment charges for period before obtaining commencement certificate charges for period before obtaining commencemer Disposed
CMP/190714/0003570 2019-07-14 Complaint under Sec 18, Sec 31 & Sec 71 of the Real Estate (Regulation and Development) Act 2016, and under Rule 17, 29 & 30 of the Karnataka Real Estate (Regulation and Development) Rules 2017. Disposed
CMP/190618/0003322 2019-06-18 Booking amount refund 2 lakhs Disposed
CMP/190611/0003274 2019-06-11 Builder is not responding to: cancellation of agreement by buyer due to delay in completion Disposed
CMP/190525/0003132 2019-05-25 Appeal for invoking section 18 of RERA Act for continuous delay in handover of apartment Disposed
CMP/190511/0002977 2019-05-11 NON REGISTRATION AND POSSESSION OF FLAT DELIVERY DATE EXPIRED Disposed
CMP/190501/0002703 2019-05-01 Misguided ,Forced to pay 10% and with out SBI approval of Tower -not given Requested Flat Disposed
CMP/190416/0002487 2019-04-16 Delay of flat delivery and Compensation as per Rera act Disposed
CMP/190321/0002481 2019-03-21 Refund of 2lac rupees token amount Disposed

Frequently Asked Questions

Based on K-RERA registered data for Provident Park Square 5
Is Provident Park Square 5 RERA registered in Karnataka?

Yes. Provident Park Square 5 is registered with the Karnataka Real Estate Regulatory Authority (K-RERA) under registration number PRM/KA/RERA/1251/310/PR/200226/003305.

What is the RERA registration number of Provident Park Square 5?

The K-RERA registration number of Provident Park Square 5 is PRM/KA/RERA/1251/310/PR/200226/003305.

What is the current construction status of Provident Park Square 5?

As of Q3 2025-26, Provident Park Square 5 is 91% complete according to its latest K-RERA quarterly filing.

Are flats still available in Provident Park Square 5?

Yes. As per the latest K-RERA quarterly filing (Q3 2025-26), Provident Park Square 5 has 7 unit(s) available for purchase.

Are 1 BHK flats available in Provident Park Square 5?

Yes. According to the latest K-RERA quarterly filing, there are 6 1 BHK unit(s) available in Provident Park Square 5, Bengaluru Urban.

Are 2 BHK flats available in Provident Park Square 5?

Yes. According to the latest K-RERA quarterly filing, there are 30 2 BHK unit(s) available in Provident Park Square 5, Bengaluru Urban.

Are 3 BHK flats available in Provident Park Square 5?

Yes. According to the latest K-RERA quarterly filing, there are 6 3 BHK unit(s) available in Provident Park Square 5, Bengaluru Urban.

Are there any RERA complaints against Provident Park Square 5?

Yes. Provident Park Square 5 has 2 complaint(s) filed against it on the K-RERA portal. Review these on the official K-RERA website before making a purchase decision.

When did Provident Park Square 5 last file a quarterly update with K-RERA?

Provident Park Square 5 last filed a quarterly update for Q3 2025-26 on 2026-03-30. The project has submitted 1 quarterly report(s) on K-RERA to date.